Childerditch

After the Principle Contractor had removed the existing vertical asbestos, we were asked to give a solution to re-clad onto very anfractuous existing steel frame. The result was installing a secondary support framework to enable a true and level structure to fix our cladding onto. A challenging project but a very rewarding end product.